World · India Bureau
Mumbai airport delays international flight relocation to Navi Mumbai until 2027
The scheduled transfer of select international flights from Mumbai's Bombay High International Airport to the new Navi Mumbai International Airport has been postponed by several months. The shift, now rescheduled for March 2027, was originally planned for an earlier timeline.
LSN India ·

The partial relocation of international flight operations from Mumbai to the newly developed Navi Mumbai International Airport has been deferred to March 2027, marking a significant delay in the airport expansion project aimed at easing congestion at the existing facility.
The decision to postpone the transfer reflects ongoing preparations required at the Navi Mumbai airport to ensure seamless operations before receiving international traffic. The revised timeline provides additional time for infrastructure completion, systems integration, and regulatory compliance procedures at the airport.
Once implemented, the partial shift is expected to relieve capacity pressures at Mumbai's existing international airport by redistributing flight operations across the two facilities. The move forms part of a broader regional aviation strategy to accommodate growing passenger traffic in the Mumbai metropolitan area.
The Navi Mumbai International Airport project has been developed to supplement existing aviation infrastructure and support long-term growth in air connectivity for western India. The phased transfer of services is intended to optimize operations while minimizing disruption to passengers and airlines during the transition period.