World · India Bureau
Two workers rescued alive nine days after Nepal hydropower tunnel floods
Two construction workers have been pulled to safety nine days after devastating floods trapped them in a hydropower tunnel in Nepal. The men survived by sheltering in an air pocket within the tunnel complex.
LSN India ·

Rescue teams in Nepal successfully extracted two workers from a hydropower tunnel on Wednesday, nine days after catastrophic flooding swept through the construction site. The workers, who had been missing since the initial flood event, were located alive in an air pocket within the tunnel system.
According to rescue officials, the men survived the ordeal by remaining in an elevated section of the tunnel where they were protected from rising waters. Their discovery marks a significant breakthrough in the rescue operation, which has involved multiple teams working in challenging conditions to locate survivors and assess damage to the facility.
The flooding incident at the hydropower project site has caused considerable disruption to Nepal's infrastructure development plans. Authorities have launched investigations into the circumstances that led to the disaster, while rescue and recovery operations continue at the site.
The successful recovery of the two workers represents a rare positive outcome in what has been a challenging rescue effort. Authorities are continuing to assess the full extent of the damage to the hydropower tunnel and related infrastructure in the region.