LSN News › India

Culture & Entertainment · India Bureau

Upper Bhadra Project begins trial release to Chitradurga branch canal

The Upper Bhadra Project has commenced a trial run of its Chitradurga branch canal with an initial water release from the Bhadra reservoir. The test phase involves releasing three thousand million cubic feet of water to assess the canal's operational readiness.

LSN India · 6 September 2026

Upper Bhadra Project begins trial release to Chitradurga branch canal

The Upper Bhadra Project initiated its trial operations on Thursday with the commencement of water release through the Chitradurga branch canal. The test run, which began at the project's intake point on the Bhadra reservoir, marks a significant milestone in the canal's development and operational assessment.

As part of the initial phase, authorities released three thousand million cubic feet of water through the canal system. The controlled release is designed to evaluate the structural integrity and hydraulic performance of the newly developed infrastructure before full-scale operations commence.

The trial run represents an important step in extending irrigation and water supply benefits to the Chitradurga district. Officials will monitor the canal's performance during this test phase to identify any maintenance requirements or operational adjustments needed before the project transitions to regular service.

The Upper Bhadra Project, a major irrigation infrastructure initiative, aims to augment water availability in the region. The successful completion of this trial phase is expected to pave the way for the canal's full operationalization and the delivery of water to intended beneficiary areas.